foxtongue: (Default)
[personal profile] foxtongue
"We just completed the 12 -- foot diameter, 500 foot deep vertical shaft for the 10,000 Year Clock."
We used a mining technique called raise boring. Take a look at the video -- it's an interesting operation. Instead of drilling down from the top, you pull a large diameter reamer up to the surface from the bottom using a smaller diameter pilot hole -- more efficient than a top-down drill because the rubble isn't fighting gravity. It rains down beneath the advancing bore and gets hauled out a horizontal shaft at the bottom. Our next major step will be cutting the spiral stairway using a robotic stone cutting saw. In parallel, we're also manufacturing and testing the Clock components.
This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

Profile

foxtongue: (Default)
foxtongue

April 2012

S M T W T F S
123 4 5 6 7
891011121314
15161718192021
22232425262728
2930     

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 6th, 2025 03:27 am
Powered by Dreamwidth Studios